Back to Vetted Sites

Top Site Advantages

Single owner
Zoned heavy industrial
Rail served site with railyard- storage capability exceeding 1,300 cars
Expedited permitting available
Site free of flood plains and endangered species

Utilities

Electric

Site is vetted to meet  electric requirement of 5 MW with redundant service. Site is vetted to meet electric requirement of  10 MW within 12-18 months, or 50 to 100+ MW in 3-5 years.

Gas

Site does not currently have gas infrastructure on site. Site is vetted to meet 50 mcfh load with delivery pressure at 10 psig or less within 2 year.

Water

Site is vetted to meet water requirement of 100,000 GPD. Higher water requirements would require significant infrastructure improvements.  

Wastewater Infrastructure

Currently no waste water on site. Site able to be served by large lagoon onsite which will require infrastructure updates to serve modern use or connection to city service.

Broadband Connectivity

Fiber on site

Transportation & Logistic Assets

Proximity to Highways/Interstate

2 miles to Illinois Route 4, 36 miles to I-64, and 37 miles to I-57

Rail Served Site

On-site Class 1 Canadian National and Union Pacific

Proximity to Airport

27 miles to Perryville Regional Airport, 30 miles to Southern Illinois Regional Airport, 78 miles to St. Louis Lambert International Airport

Additional Details

Workforce

Labor force of 684,000+ within a 60 mile radius
Address

1439 Cutler Trico Road
Cutler, Illinois
(38.0046, -89.5706)

Target Industries
  • Agribusiness
  • Assembly
  • Transloading
  • Distribution centers 
Number of Owners

Single owner

Divisable

Yes

Get In Touch

Interested in this vetted site? Let us know today!